Lowrance Elite Ti2 detailed installation

Will Davis from Grift co. talks through the process of fitting two Elite9 Ti2s to his project tinnie.

๐Ÿ‘‡๐Ÿผ๐Ÿงพ๐Ÿ•Timestamps for all the installation steps are listed below ๐Ÿ•๐Ÿงพ๐Ÿ‘‡๐Ÿผ

Timestamps:
1:00 – Unboxing
3:57 – Disconnecting Battery
5:07 – Removing Old Sounder
7:30 – Placement of a New Sounder
9:58 – Planning wiring Sequence
11:52 – Drilling holes for cable routing
13:40 – Routing Transducer Cable
15:20 – Mounting Brackets to Transducer
17:48 – Mounting transducer to hull
17:56 – Connecting Blade fuse to power cable (before I feed the cable through)
22:03 – Re-wiring the blade fuse so we can fit everything through the routing holes
22:52 – Connecting power cables to BUS Bar / Switch Panel
24:25 – Initialising power to the cables
25:30 – Quick tips for plugging cables into the MFD (Multi Function Display)
26:47 – Powering up for the first time!

Leave a Reply

Your email address will not be published. Required fields are marked *